Microcement vs Cement Screed

Microcement vs Cement Screed in Singapore

Is microcement the same as cement screed?

No. Cement screed is a 20–50mm structural substrate made from cement, sand and water, while microcement is a 2–3mm decorative finish made with cement, polymer resin, pigment and aggregate. Screed usually sits under tile or vinyl; microcement is sealed in 2 coats and costs S$30–70/sqft.

Not the same thing.

Cement screed is the structural base under your finish. Microcement is the decorative surface you see and touch. People mix the two up constantly — here is the clean distinction.

This page compares the two build-up layers only. For pricing, scopes and where microcement is installed across a whole home, see the microcement Singapore pillar.

Microcement plaster finish layered over cement screed substrate — Pico X Health

Microcement vs cement screed at a glance

 Cement screedMicrocement
RoleStructural substrateDecorative finish
Thickness20–50mm2–3mm
CompositionCement + sand + waterCement + polymer resin + pigment + aggregate
LookGrey, utilitarian, hairline cracksContinuous, hand-trowelled, sealed cream tones
WhereUnder tile, vinyl, or as raw industrial floorWalls, splashbacks, bathroom walls, feature floors
Sealer needed?OptionalAlways (2 coats)
Cost$4–7/sqft$30–70/sqft

How the two layers stack in a real build-up

In almost every Singapore renovation the two are not alternatives — they are neighbours in the same sandwich. From the slab upward:

  1. Structural concrete slab. The developer's floor. Never touched in a normal reno.
  2. Cement screed, 20–50mm. Poured to correct level, fall and services routing. This is what makes a floor flat.
  3. Primer and mesh. Bonding coat, plus fibreglass mesh where movement or grout lines need bridging.
  4. Microcement, 2–3mm. Two to three hand-trowelled layers, each thinner than a coin.
  5. Polyurethane sealer, 2 coats. The layer that actually resists water, stains and abrasion.

The practical consequence: screed problems become microcement problems. A screed with the wrong fall, trapped moisture or live cracking will telegraph straight through a 2mm finish, which is why we check substrate before quoting any floor.

"Screed floor" is usually one of three things

  1. Raw cement screed. Industrial look, exposed substrate, sealed. Cheap, but greys aggressively and hairline-cracks.
  2. Polished concrete. Mechanically ground and sealed. Much more expensive than screed; closer to microcement in finish but not the same.
  3. Microcement floor. A 2–3mm decorative layer over screed. This is what most Singapore homeowners actually mean.

Durability and repair — the honest comparison

Timeline and disruption

A screed pour needs 24–48 hours before foot traffic and, as a rule of thumb, roughly one day of drying per millimetre before a moisture-sensitive finish can go over it — a 40mm screed can hold a project for weeks. Microcement over an existing cured screed is far quicker: 3–4 working days for a feature wall, around nine for a full-plaster bathroom, because each thin layer cures in hours rather than days.

When to choose which

If you like the look of grey, brutalist screed — you are usually looking at microcement on a feature wall, not raw screed on the floor. Raw screed is unforgiving in a humid HDB. For dry-area floors, the SPC microcement-vinyl plank gets you most of the aesthetic at a fraction of the cost and zero hairline cracks. For wet-area floors and bathroom walls, authentic plaster — see the microcement bathroom page.

FAQ

Is microcement the same as cement screed?

No. Cement screed is a 20–50mm structural substrate (the base under your tile). Microcement is a 2–3mm finish (the surface you see). One is structural, the other is decorative.

Can I put microcement over cement screed?

Yes — and that is the textbook substrate. A flat, cured cement screed is the cleanest base for microcement plaster.

Is cement screed cheaper than microcement?

On its own, yes. Screed alone is roughly $4–7 per sqft. Microcement plaster finish is roughly $30–55 per sqft (walls) or $35–70 per sqft (floors). The screed is the canvas; the microcement is the artwork.

How long must new screed dry before microcement?

Plan on roughly one day per millimetre of screed thickness, and always confirm with a moisture reading before the primer goes down. Trapped moisture is the single most common cause of a finish lifting.

Can microcement fix an uneven screed floor?

No. At 2–3mm it follows whatever it is laid on. Levelling is a screed or self-levelling-compound job that must be done first.